MANUFACTURING / IT & Infrastructure

Protect engineering information beyond the file share.

Drawings, tooling specifications and quality records carry commercial value even when production runs normally.

See the engineering-file access example ↓

Giving a supplier access for a legitimate machining or design job creates an ongoing responsibility to control who can use that information.

IT needs to preserve the right revision for authorised work while removing access that no longer has a business purpose. This page joins information ownership, permissions and project close-out without confusing backup with confidentiality.

CORE MANUFACTURING / 02 · THE BUSINESS IMPLICATION

Join the information owner to the access owner

A supplier may lose its named account but retain a sharing link or downloaded file. Revocation reduces future exposure; it cannot recall copies already taken. Engineering needs to understand both the review result and its limitations.

The NCSC principles support continuing oversight of suppliers. Our recommendation is to make project closure an explicit trigger for a permissions review, rather than rely on an informal message or assumed expiry. Source: NCSC · Supply chain security guidance ↗

03

FROM THE ISSUE TO THE ACTION

Practical checks to take into the discussion

  1. Define the information and purpose

    Identify the approved revision, information owner, authorised users and reason for sharing. Keep the record internally; do not upload drawings or customer records into this page.

  2. Review every access route

    Check guests, groups, shared links, remote access and customer-controlled permissions. Apply least privilege and a review date; confirm available Microsoft controls and licence requirements.

  3. Verify closure and retain evidence

    Ask the sponsor whether access should end or be extended. Record the change and verification. Handle retained copies and contractual evidence under the applicable agreement and retention policy.

04 / WORKED EXAMPLE / OPTIONAL EXERCISE

Engineering-file access review

The example follows one information set through approval, sharing and closure. Use it to spot a missed handover, then capture an appropriate non-sensitive review record in the optional worksheet.

Worked example

Approve — Drawing C shared for one machining job

Core Manufacturing

Illustrative core manufacturer: a supplier is given temporary access to a revised technical drawing. Confirm who approved access, which version is current, expiry date and who records that permissions were removed.

Create your decision record (optional) ↓
Optional worksheetPage overview ↑
Choose your working environment
Example scenario

Illustrative core manufacturer: a supplier is given temporary access to a revised technical drawing. Confirm who approved access, which version is current, expiry date and who records that permissions were removed.

Follow the example. Check your evidence.

Use a generic activity. Do not enter customer names, credentials or confidential details. “Verified” means you have checked evidence for your own process.

01

Approve purpose

Drawing C shared for one machining job

Evidence / next action: Record authoritative information, purpose, named sponsor and expiry.

02

Revoke access

Machining guest and sharing links removed

Evidence / next action: Remove only expired access; retain contractual evidence through approved users.

03

Verify and record

Engineering confirms guest cannot reopen drawing

Evidence / next action: Test the access boundary and retain dated confirmation.

Complete your reusable decision card (optional)
Guidance and reusable worksheet

Use a four-field access record: information/workspace, approved purpose, accountable owner, access review or expiry. For each project, confirm the authoritative file and the safe way to share it.

Core Manufacturing illustration

Illustrative core manufacturer: a supplier is given temporary access to a revised technical drawing. Confirm who approved access, which version is current, expiry date and who records that permissions were removed.

Industrial / Supply Chain illustration

Illustrative industrial supplier: a customer project closes, but an external user can still open the Teams site. A close-out record documents the project owner, the access removed, the date and verification.

Turn the evidence gap into a useful conversation. Use the record internally first. If you need help with the controls or recovery evidence, discuss the general issue with Matthew.

See the completed access example; discuss data controls ↗

HOW ASSURED DIGITAL CAN HELP

Discuss engineering-file access with Matthew

Assured Digital can help review Microsoft sharing, guest access and information-governance controls. The aim is authorised collaboration with clearer ownership and evidence, while suppliers continue legitimate work.

Explore the relevant service ↗
LRQA Certified ISO/IEC 27001, UKAS Management Systems accreditedLRQA Certified ISO 9001, UKAS Management Systems accreditedCyber Essentials Plus certified
Evidence of the approach, not a claimed manufacturing case study

ASDAN is an education and awarding organisation. Assured Digital’s published customer story describes stronger digital foundations, clearer ownership and reduced firefighting across a complex estate. Melissa Farnham, CEO of ASDAN, said: “We can now think about the future, rather than how to get to Friday.” This illustrates our method; it is not proof of a particular manufacturing security outcome.

Read the ASDAN customer story ↗
Further resources, diagnostics and source notes

Explore another worked scenario

Record the task, recovery targets, dependencies, test evidence and the decision to release.

Download the recovery acceptance worksheet ↓
Recovery chainWORKED SCENARIO
Choose a decision to explore

The specification is back

Restore the approved production specification and confirm its version against the change record.

Who acts
Backup and recovery owner
What to record
Restore record and approved version match.

OPTIONAL NEXT STEP

Choose a useful next step

The examples are available without registering. If you want a broader starting point, the optional diagnostics can help organise your questions. Their results are self-reported and do not replace a technical review.

Two common questions

Do we need to replace our MSP?
No. The first step can be a joint discussion or defined review alongside your existing provider.
Is this a technical audit?
The page and examples are educational. Any technical review would need agreed access, scope and terms.
IT & Infrastructure Cyber Resilience for UK Manufacturers | Assured Digital